- Home
- Calendar of public speaking opportunities
- A proposal to reduce trash in Zilker Park
- Barton Creek banks in Zilker Park, photo journal
- Bathhouse Rehab - Please "press PAUSE"
- About PIR and ACAP requests for info
- Butler Landfill
- A Study: French Broad River Dog Park, Asheville, NC
- Trail of Lights 2023: Selling Zilker Park at VIP prices, limiting hours of free access, and charging fees for children's "free admission on all event nights"
Saturday, January 6, 2024
01-06-2024 Update on the state of the park after ACL Fest and Trail of Lights
The contract for the Trail of Lights allows them to
continue "clean up days" through 01-08-2024.
The Butler Landfill cap:
This parking area is not supported by 6-8" of gravel substrata.
Why would cars be allowed to park here on the landfill cap?
I hope that the sidewalk extension will continue
over this mud zone, to the crosswalk on
Barton Springs Road at Stratford.
The Polo Field. Trail of Lights operator was allowed
to use 100% of the Polo Field for visitor paid-parking,
at $30 per car. The west 50% section that was previously green
is now damaged. Will TOL pay for its remediation?
The Polo Field was used as a temporary dump for Christmas trees.
Austin Resource Recovery will hopefully make other arrangements
when the Polo Field is closed to vehicles and revegetated.
Informal paths between the Polo Fields and the Playscape/Pool
are still compacted and barren.
This path was used as the ACL customer admission queue:
Other informal paths:
Barton Creek banks show exposed tree roots,
fallen trees and deep grooves where rain
flows in channels downhill into the creek.
Zilker Boat Rentals:
Tree loss:
The Rugby Field shows patches of sod applied after ACL Fest.
Areas that continue to be compacted and barren:
Friday, November 24, 2023
11-24-23 Update on Lou Neff Point and nearby tree loss in Zilker Park
On November 1st, 2023, I presented several pictures to the Environmental Commissioners during their meeting. It is well-known that the creek banks in Zilker Park are in a poor condition.
[See my previous post: https://www.todayinzilkerpark.com/2023/09/high-priority-repair-barton-creek-banks.html]
This past week, a living tree has fallen into Barton Creek; the location is just north of the Zilker Boat Rentals concession.
Lou Neff Point remains in a vulnerable state: The lone tree on Lou Neff Point could similarly be lost.
I ask City Council Members to adequately fund the remediation of the creek banks -- including a robust study of drainage problems and solutions to reduce future erosion -- for the FY24-25.
More recent photos of the Barton Creek Banks in the recreational zone of Zilker Park:
11-24-2023 Current state of the Butler Landfill gravel lot after ACL Festival '23
The Butler Landfill gravel lot currently covers 3.8 acres in Zilker Park. According to FEMA maps of the 100-year floodplains in Austin, TX, the entire Butler Landfill is within the 100-year floodplain:
I ask:
• Is this cap condition still considered "temporary"?• Have the ACL uses of the revegetated west zone violated the requirements to not "disturb" the landfill cap?• Does the current TCEQ permit for this area allow heavy vehicles to be parked beyond the driveway mats in the revegetated zone?• Would FEMA be concerned that the Butler Landfill's "gravel lot" -- a 3.8 acre site located within the 100-year flood plain -- has been severely compacted and now functions as impervious cover?
The general public seems to be stuck in a situation where heavy trucks/buses/cars are allowed to drive on a parking surface constructed from environmentally mediocre materials (because grasscrete pervious pavement was deemed too expensive for a "temporary" use in 2018) on a fragile landfill cap (the trash below was still wet when the MoPac extension pilings were dug in 1986), in a parking lot that doesn’t meet the requirements for either dust (TCEQ) or shade (COA), in a situation that is agreed by various experts to be “temporary” (TCEQ, PARD, WPD) with no “expiration date” of its ongoing use as a parking lot.
Photo of the Butler Landfill trash in 1966:
Problems with dust in summer of 2023:
Below, the current shade requirements for parking lots:
The lack of shade is one reason that this lot is not currently COA code compliant
During ACL '23, a large area of the revegetated portion was used for storage of heavy equipment, see photo below. The damage to the vegetation is now an area much larger than the driveway mats (see pics below).
Does the current TCEQ permit for this area allow heavy vehicles to be parked beyond the driveway mats?
Below, the landfill cap during ACL staging 2023:
The evidence of widespread damage to the revegetated portion of the landfill cap (the light brown is the matted driveway; the dark soil is the damaged revegetated zone):
After ACL concluded, the Great Lawn was damaged and required new sod to be installed.
As this photo shows on 11/24/23, the Butler Landfill gravel lot is currently being used to store damaged sod:
Below, by November 2023, last summer's top layer of loose rock is now largely missing.
In its place is a severely compacted surface of impervious cement-like structure.
My questions:
• Is this cap condition still considered "temporary"?
• Have the ACL uses of the revegetated west zone violated the requirements to not "disturb" the landfill cap?
• Does the current TCEQ permit for this area allow heavy vehicles to be parked beyond the driveway mats in the revegetated zone?
• Would FEMA be concerned that the Butler Landfill's "gravel lot" -- a 3.8 acre site located within the 100-year flood plain -- has been severely compacted and now functions as impervious cover?
Subscribe to:
Posts (Atom)
[2026-02-17] The proposed TxDOT-TTC $25M Boardwalk. My findings and database of Public Information Requests
I would like to wrap up my extensive research into the TxDOT TTC $25M Boardwalk by sharing my summary findings with the public, and by provi...





























