Post #2 in a series
Below is a sequence of design images related to the Joan Means Khabele Bathhouse rehabilitation project, shown in chronological order.
1946 Plan

2016 Feasibility Study Recommendations

“Zilker Park Bathhouse Zone Feasibility Study,” City of Austin Parks + Recreation Department, MWM DesignGroup, June 10, 2016.

From Section VII, Recommendations, 1. Bathhouse Rehabilitation, a) Phase 1: Life Safety and Access Improvements.

From Section VII, Recommendations, 1. Bathhouse Rehabilitation, d) Phase 4: Rehabilitation of Rotunda and Changing Areas.

From Section VII, Recommendations, 2. Sheffield Education Center Improvements.

Zilker Park Bathhouse Zone Feasibility Study, site diagram.
A Vision Plan Created by Barton Springs Conservancy, 2016–2017

Barton Springs Conservancy promotional video, “BSC – For the Love of the Springs” (One Story Productions), vimeo.com/216682712.

Barton Springs Conservancy promotional video, “BSC – For the Love of the Springs” (One Story Productions), vimeo.com/216682712.
Prior to Bathhouse Rehab: Existing Floor Plan

2019: Limbacher's Final Preferred Scheme

For Comparison: Limbacher's 2008 Proposal
The 2019 designs above came from architect Laurie Limbacher. Limbacher had also proposed a bathhouse design more than a decade earlier, shown to the public in 2008.

Barton Springs Pool Master Plan, 2008. See the annotated version.